Oploy Logo

SCND Decision Support — NL (2026–2030)

Simple, capacity-constrained network view for an imaginary e-commerce expansion in the Netherlands. Adjust FC openings to see capacity sufficiency and cost impact.

FC Planning (capacity & start)

Existing: Utrecht FC 25k active from 2026 H1.

Quick setup: choose Capacity and Start period for each FC.
FC CityCapacityStart period
Zoetermeer
Enschede
Groningen
Eindhoven

Netherlands — Schematic Network

Utrecht — DCZoetermeer — DCEnschede — DCGroningen — DCEindhoven — DCDordrecht — DCNijmegen — DCApeldoorn — DCGouda — DCUtrecht — HubZoetermeer — HubEnschede — HubGroningen — HubEindhoven — HubZaandam — HubUtrecht — FC (25k), start 2026 H1UtrechtZoetermeerEnschedeGroningenEindhovenDordrechtNijmegenApeldoornGoudaZaandam
FC
Hub
DC

Stylized layout (not to scale).

Capacity vs Topline (daily)

Total Cost Overview

CAPEX (one-off) vs Total OPEX (2026–2030).

Total (CAPEX + OPEX): 0 M€
Transport assumptions: 500 orders/truck, €1.5/km, €50/truck handling; one-way legs (Hub→FC, FC→DC).
Selected by solver: Enschede 10k from 27 H2, Zoetermeer 10k from 29 H2.

Total Cost Overview

CAPEX (one-off) vs Total OPEX (2026–2030).

Total (CAPEX + OPEX): 0 M€
Transport assumptions: 500 orders/truck, €1.5/km, €50/truck handling; one-way legs (Hub→FC, FC→DC).